Skip to content
Pocketto
Getting started

Choosing the right workflow

Match the ceremony to the risk: route a task to the full pipeline, a standalone skill like hotfix or bug-hunting, or Pocket Education.

Pocketto has one rule for routing: match the ceremony to the risk. Features that span files and phases get the full pipeline; small, clear work gets a focused skill.

The router

Your situationStart with
Rough idea, no clear problem yet: need to explorepocket-pitching
Clear problem: need a spec + acceptance criteriapocket-grinding
Approved spec: need a TDD execution planpocket-planning
Execution plan ready: sequence/phase itpocket-structuring
Plan or phase file ready: execute task-by-taskpocket-development
Phase-level pass complete: reconcile and closepocket-closing
A bug, a failure, or "audit this code"bug-hunting
Small-to-medium change, full pipeline is overkillhotfix
Design system / brand identity / UI tokensbrand-design
An assumption to validate before planningstructured-research
Review a plan before executing itvalidate-plan
Existing repo needs a local project guide or learner calibrationpocket-init
You want to write the code yourself, with guidancepocket-education
Team needs GitHub lifecycle synchronizationPocket Enterprise

Rules of thumb from the built-in router (pocket-help):

  • Don't know if the problem is well-formed? → pocket-pitching
  • Problem is clear but needs a real feature plan? → pocket-grinding
  • It's a quick, well-understood change? → hotfix
  • Something is broken? → bug-hunting
  • Holding an unverified assumption? → structured-research
  • Already have an approved spec? → pocket-planning

The triviality off-ramp

pocket-grinding checks task size as soon as the context scan makes it estimable. A task is trivial when it touches only 1–4 files and is resolvable in 1–2 requests, with none of these complexity signals: a new system or architectural decision, unclear or contested requirements, or API contract / system-boundary changes.

When the heuristic fires, the skill recommends hotfix, which still enforces a brief-plan + subagent-review gate, before the multi-stage ceremony starts. "New feature" alone does not suppress the check: a small, clearly-specified feature like "add a zoom button" is a hotfix candidate. The discriminator is requirement clarity + size + architectural impact, not the label.

The gate is advisory: continue with grinding if you expect hidden complexity.

Entry points into the pipeline

You do not always start at the top:

You already have…Start at
Only a fuzzy ideapocket-pitching
A clear problempocket-grinding
An approved specpocket-planning
An execution planpocket-structuring
A plan/phase file ready to buildpocket-development
A finished, passing phasepocket-closing

On this page